loading

Focuses On Professional Cleanroom Project And Pharmaceutical Cleanroom Equipment.

Laboratory Cleanroom System Project in Mongolia

  • Project name: ISO7 Cleanroom Laboratory Renovation Project for Pharmaceutical Industry
  • Customer information: Pharmaceutical industry research and development institutions
  • Core Demand:  Renovate a 20㎡ pharmaceutical laboratory cleanroom, equipped with cleanroom equipment and ventilation systems, to satisfy laboratory testing and Mongolia compliance acceptance criteria.
  • Project Level: Class ISO7 + Supporting Standards: CE Certification, Local FDA Compliance Standards.
  • Delivery cycle: 5 days for design + 10 days for production, transportation and other work + 3 days for installation, including the whole pre-preparation process)
Laboratory Cleanroom System Project in Mongolia 1
Laboratory Cleanroom System Project in Mongolia 2
Laboratory Cleanroom System Project in Mongolia 3
Laboratory Cleanroom System Project in Mongolia 4
Project Key Challenge

About the pharmaceutical laboratory: The pharmaceutical industry has stringent requirements for laboratory cleanliness; the clean environment must meet the standards stably, and the compliance acceptance criteria are high, requiring passing the local FDA and relevant international certifications.

About the customer: The laboratory renovation has an urgent construction period requirement, needing to be completed in a short time, while ensuring the convenience of laboratory testing processes and the integrity of equipment supporting.

SZ-PHARMA Customized Solutions

The city of Ulaanbaatar, Mongolia is no stranger to Suzhou Pharma Machinery, because we designed a milk factory project in the city in 2019. This time our engineers have returned to the same place to complete the installation of another new project.

This project is about laboratory renovation. The cleanroom laboratory cleanliness is ISO7, using high-quality manual sandwich panels, thickened PVC floor, LED lighting system, customized large-size observation window (easy to observe the testing process in the laboratory), cleaning steel door. It is equipped with air shower room, DPB (Dynamic pass box), bio-safety cabinet, convenient air conditioning with FFU; The whole laboratory adopts the advanced return air system design concept.

Suzhou Pharma is known for its professional experience and rigorous detail control. Before signing the order, we communicated with the customer online, and the drawing design took 5 days. After that, the efficient production, packaging, transportation of the goods, and the preparation of shipping documents amounted to 10 days. It must be emphasized here that all clean room materials provided by Suzhou Pharma have passed CE testing and obtained certificates, so that customers can easily obtain local FDA approval and start the working.

Meeting Core Indicators

The detailed preparatory work facilitated the formal commencement of the project. The installation period of the project was only 3 days, and the installation team only consisted of 3 people. We finished such a perfect job in such a short time and with so few people!Kevin, the  experienced engineer of Suzhou Pharma Machinery, collaborated with the client's engineers to work efficiently and complete the cleanroom installation and all on-site equipment testing in the shortest possible time.

  • Cleanliness Indicator: Stably meeting the ISO7 cleanliness standard, the overall air circulation and clean control effect of the laboratory conform to the environmental requirements for pharmaceutical R&D and testing.
  • Supporting Indicators: The combination of the advanced return air system and FFU air conditioners ensures the stability of air pressure and cleanliness inside the laboratory, and the equipment operation is adapted to the environmental requirements of daily laboratory testing.
What can we do?

One-stop Full-process Service System: Covering all links such as pre-sales online communication, scheme design, production and transportation, on-site installation and commissioning, after-sales maintenance, as well as providing supporting services such as spare parts supply and regular maintenance. It creates a comprehensive project service experience for overseas customers and solves the communication and implementation problems of cross-border projects.

We hope that our clean room projects can be spread throughout the cities of this beautiful country. Suzhou Pharma has a perfect service system, including pre-sales consultation, scheme design, on-site construction guidance, after-sales service, spare parts supply and regular maintenance and other one-stop services, enhance customer experience and trust. We provide professional cleanroom system solutions and services for customers all over the world.

Suzhou Pharma Machinery Co.,Ltd.

2024/05/22

Tia

prev
PHARMA CLEAN——New Cooperation Project about VHP Isolator System
no data
Get in touch with us
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2026 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
whatsapp
Contact customer service
Contact us
whatsapp
cancel
Customer service
detect