Clean workshops are widely used in modern production, food, medicine, machinery industry, etc. will use clean workshops. So today, let's take a look at the clean workshop decoration and production equipment installation and clean workshop decoration quotation list with sz-pharma editor~ 1. Clean workshop decoration and production equipment installation Clean workshop decoration materials: heat insulation sandwich panel, purified aluminum material , purification lamp, pvc floor, floor paint. Clean
pharmaceutical cleanroom decoration equipment: air shower room, transfer window, clean workbench, FFU fan, high-efficiency air outlet, air conditioner, clean shed, laminar flow hood, etc. Before unpacking the clean workshop decoration purification equipment on site, it should be stored in a relatively clean environment, and attention should be paid to moisture-proof. The outer packaging of the equipment should be removed in a designated uncontrolled environment (except for biological safety cabinets), but the inner packaging should not be removed or damaged. The inner packaging of the equipment should be vacuumed from top to bottom in a controlled environment in the front room of the entrance, cleaned, and then removed. The outer packaging film of the equipment should be peeled off in order from top to bottom. When the equipment is transported to the site and the inner packaging is unpacked, the packing documents, accessories and
pharma machinery should be checked and the unpacking acceptance record should be filled out, and then the inspection should be reported to the supervising engineer. Installation should begin immediately after unpacking the device for inspection. When the fan base of the purification equipment with a fan is softly connected to the box, the base should be erected and fixed during transportation, and then put down after being in place. The installation of purification equipment should be completed in the interior decoration of the clean workshop and the construction and installation of the purification air-conditioning system, and it should be thoroughly cleaned and wiped, but the pharma machinery connected to the enclosure structure or its exhaust and drainage pipes must be constructed at the same time as the enclosure structure. When it is connected to the solid protection structure, the arc transition should be made, the radius of curvature should not be less than 30mm, and the joints should be densely cleaned to ensure strict cleaning. The supply, return and exhaust (water) of the equipment or its pipelines should be closed before the equipment or its pipelines are installed, after installation and before the clean workshop is put into operation. The ground on which the equipment is installed should be level and flat, and the equipment should keep its vertical axis vertical and horizontal axis horizontal after the equipment is installed in place. A vibration isolation layer should be placed between the airlock with a fan or the air shower and the ground, and the gap should be sealed with sealant. The laminar flow hood with the fan is directly installed on the upper leaf of the ceiling, and the contact parts between the box rest and the ceiling plate should have anti-vibration measures such as vibration isolation pads, and the gap should be sealed with sealant. For equipment with a fan, the fan should be tested after installation. The rotation direction of the impeller should be correct during the test run. The test run time should be determined according to the requirements of the technical documents of the equipment. When there is no regulation, it should not be less than 1h. 2. List of clean workshop decoration quotations: Class 10 ≥ 100 ≥ 1,000 ≥ 10,000 ≥ 100,000 ≥ 300,000 ≥ 1 million The cleanliness of a million-level clean workshop seems to be low. In fact, it is equivalent to ordinary decoration. Strictly speaking, it is not a level. 1. Generally speaking, the price for a class 300,000 to 100,000 clean room is about 1,000 yuan/㎡; 2. The price for a class 10,000 clean room is about 1,000 to 2,000 yuan/㎡; 3. The price for a class 1,000 clean room is about 5,000 yuan. 4. The quotation for the decoration of a class 100 clean workshop is about 8,000 yuan per square meter. After all, this type of sterile workshop is often used in places that require isolation such as surgical transplantation, and has high requirements for decoration. 5. The aseptic and clean workshops above grade ten have high requirements for decoration companies and higher quotations. Such workshops are often used in some industrial semiconductors. 3. Factors affecting the quotation of clean room decoration 1. Industry: The cost per square meter of a clean room factory in a clean room actually depends on which industry it belongs to, and the prices of different industries have certain differences.
Different industries have different requirements. On-site purification plants sometimes require heat preservation and moisture protection, and sometimes require protection from electrification. 2. Purification area: any industry is designed and constructed according to the site area, so the area is one of the reasons that affect the cost. 3. Design and separation of factories: Purification factories are not only manufacturing factories, but also have high requirements. Many auxiliary factories such as sterilization factories and packaging factories are needed. The separation of each factory will consume engineering materials, which will naturally affect the price. . 4. Selection of material consumables: Needless to say, what kind of purification material should be selected needs corresponding price. Some companies are particularly demanding, and if they need good materials, the price will of course be high. 5. Air conditioning system: The clean air conditioning system is used to maintain the temperature and humidity, wind speed, pressure, cleanliness and other parameters required by the clean room.
Enterprises need to choose the appropriate auxiliary system according to their own investment budget and construction needs, and the price of the selected air conditioning system varies. The engineer first measures the size of the site to make the plan drawings, and according to the specific conditions of the project, taking into account the economic affordability of the enterprise, comprehensive various factors to decide what purification plan to adopt. According to the drawing design, the specific material quotation (including ceiling, next door, floor, air conditioner, air shower, etc.) was prepared, which met the production and use requirements of the enterprise, and designed a reasonable project cost, economical, energy-saving and practical plan. sz-pharma focuses on the construction of clean workshops in the food industry, biomedicine, cosmetics industry, electronics industry, medical equipment, optical semiconductors, etc. The cumulative construction area exceeds 100,000 square meters, and a large number of cases under construction can be visited! sz-pharma Qualification: Construction Engineering General contracting of construction, professional contracting of fire protection facilities engineering, professional contracting of building decoration and decoration engineering, professional contracting of electronic and intelligent engineering, professional contracting of construction electromechanical installation engineering! For engineering consultation, please call: Looking forward to cooperating with your company!
The use and installation of CUSTOM SOLUTION SERVICES is compared with most other systems for managing the extraction machine effectively and no doubt CUSTOM SOLUTION SERVICES have won the race so many times.
If you are looking for a reputable CUSTOM SOLUTION SERVICES extraction machine, you are on the lucky side as we are among the leading supplier in China. Visit the given links PHARMA MACHINERY to know more.
When it comes to CUSTOM SOLUTION SERVICES extraction machine, SUZHOU PHARMA MACHINERY CO.,LTD. is the name to reckon with. Not only are they best, they are the most experienced as well and provide wide range of services as well as products at affordable prices. Find out more information on PHARMA MACHINERY.
In conjunction with retraining and upskilling efforts, SUZHOU PHARMA MACHINERY CO.,LTD.’s workers should focus on growing unique human skills that high-tech machines are unable to replicate, such as strategic and abstract thinking, complex communications, creativity and leadership competencies.
With its quality certified and recognised by professional intitutions and customers, SUZHOU PHARMA MACHINERY CO.,LTD. is one of the leading providers in China.