Focus on professional factory cleanroom workshop project and machinery only                          Phone: +86 18241958031    Email: pharma@sz-pharma.com          

Home  > PRODUCT  > Pharma Cleanroom Equipment  > HVAC System  > 

HVAC System for Lab/Food Workshop / Tablet Production

这里可以自定义设置
HVAC System for Lab/Food Workshop / Tablet Production
Model:
PH-W
MOQ:
1 SET
Delivery Time:
15-20 days
Start Port:
Shanghai
参数暂无数据

Add success, do you want to check your shopping cart?

暂无分享


  • After Warranty Service: Video technical support, Online support, Field maintenance and repair service

  • Used: GMP clean room; Changing Room: Clean Booth; Hospital: Laboratory; Food workshop

  • Certification: CE ISO GMP

  • Name: HVAC System


product-PHARMA-hvac unit-img


Limit Discounts

Limit Discounts


product-PHARMA-HVAC System for LabFood Workshop Tablet Production-img


Description

Description


HVAC is suitable for all kinds of hospitals, shopping malls, factories, schools, clothing factories, etc. The air conditioning system can be centralized to control temperature, humidity, and can also be divided into separate control Through a filter system, clean air and environment are provided.


product-new hvac system-PHARMA-img
Characteristics

Specifications


1. Energy saving, recovery heat during winter operation;
2. Microcomputer control, with multiple protection functions;

3. Using 134a environmental refrigerants;

4. Easy to measure;

5. Easy installation, low maintenance costs;

6. Flexible application, easy adjustment.

Technical Parameters

Technical Parameters


1Chillers

• Cools water used in HVAC systems      •Requires uninterrupted power

• HVAC blows only warm air without chiller      •lakes a long time to restart after loss of power

2Heat Exchanger• Extracts heat from system
3Air Handler• Forces air throughout ductwork
4Cooling Tbwer• Dissipates heat from chiller
5Dehumidification• Meet the most stringent moislure/humidity control needs
6air condition system Air Handling Units

• As part of a heating,ventilation,and cooling (HVAC system)

• Will be connected to a ductwork ventilation system that distributes the conditioned air through 

the building and returns it to the AHU

7HEPABOX

• Applies to different classes & structure uneven clean rooms.

• Gel mini-pleat HE PA filter with better sealing

Installation

Installation


product-hvac unit-PHARMA-img

product-HVAC System for LabFood Workshop Tablet Production-PHARMA-img


product-PHARMA-new hvac system-img


product-PHARMA-hvac unit-img-1


product-PHARMA-HVAC System for LabFood Workshop Tablet Production-img-1

product-new hvac system-PHARMA-img-1

product-hvac unit-PHARMA-img-1


product-HVAC System for LabFood Workshop Tablet Production-PHARMA-img-1


Product Message
Product Message
Product Message
Chat Online
Chat Online
Leave Your Message inputting...
Sign in with: