loading

Focuses On Professional Cleanroom Project And Pharmaceutical Cleanroom Equipment.

Purification panel installation in Thailand Cleanroom Project

In order to adapt to the new situation and development of China's pharmaceutical industry and improve the quality of drugs through stricter and more comprehensive drug production quality management standards, the Ministry of Health implemented the 2010 revised version of GMP from March 1, 2011. According to the new version of GMP requirements, GMP certification has changed from static to dynamic, which means that the requirements for clean rooms are becoming increasingly high. Pharmaceutical companies need to carry out comprehensive quality control from design, construction, and later operation management to meet the requirements of the new GMP. As an important stage in the formation of a clean room, construction requires construction personnel to strictly follow the requirements of the clean room for production and installation. The clean air conditioning system, purified color steel plate system, and clean floor are important components of the clean room, ensuring high-quality and high-level construction to ensure the smooth passing of GMP certification.

Purification panel installation in Thailand Cleanroom Project 1

1. Preparation work

Before installing the inner corner of the purification board arc, the following tools and materials need to be prepared: woodworking saw, electric drill, wrench, screwdriver, waxed cardboard, purification board, clip, glue, etc.

2. Installation steps

  • Measure the length and width of the purification board, cut the waxed cardboard according to the actual size, and stick it on the purification board with glue to prevent damage to the surface of the purification board during cutting.
  • Use a woodworking saw to cut the purification board into corresponding sizes according to the size requirements, and then further process the purification board.
  • Mark the installation position of the arc concave corner. Before starting the installation, it is necessary to confirm whether the corresponding purification plate, end line, clip, support corner and other parts are complete and free of defects.
  • Install the support angle first, cut it to the appropriate length as needed, and then use a screwdriver to fix it on the purification board.
  • Next, install the clip and terminal wire on the support angle, and connect the purification plate to the support angle through the clip.
  • Before installing the concave corner of the arc, it is necessary to clean the surface of the purification plate to ensure that it is dry and clean. Then, place the concave corner at the arc and fix it with glue.
  • Finally, check the entire installation process for any issues. Once confirmed, use an electric drill to tighten all screws.

Purification panel installation in Thailand Cleanroom Project 2Purification panel installation in Thailand Cleanroom Project 3Purification panel installation in Thailand Cleanroom Project 4

 

Suzhou Pharma Machinery Co.,Ltd.

2024/09/27

Gino

prev
What should the operation and management of clean rooms do?
Analysis of functions and advantages of fume hood
next
no data
Get in touch with us
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2025 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
email
whatsapp
contact customer service
Contact us
email
whatsapp
cancel
Customer service
detect