Maintenance of refrigeration equipment in sterile room workshop
The maintenance of refrigeration equipment is divided into fault maintenance and regular maintenance; the container of the refrigeration device, in the ammonia refrigeration system, includes a high-pressure liquid storage tank, an intercooler, an oil collector, a drain tank, a low-pressure circulating liquid storage tank, etc. , the heat exchanger includes condenser, evaporator, subcooler and cooling...
Text label: sterile workshop refrigeration equipment, sterile room equipment, sterile pharmaceutical cleanroom design and decoration
Overhaul of refrigeration equipment in sterile room workshop
The maintenance of refrigeration equipment is divided into fault maintenance and regular maintenance; the container of the refrigeration device, in the ammonia refrigeration system, includes a high-pressure liquid storage tank, an intercooler, an oil collector, a drain tank, a low-pressure circulating liquid storage tank, etc. , Heat exchangers include condensers, evaporators, recoolers and cooling pipes, etc. There are many types of containers and heat exchangers, and their functions are different. The causes of damage and the methods of repair are similar. The reasons for the damage of the container and the heat exchanger: the working surface is polluted, and the working surface of the container and the heat exchanger is polluted, which will reduce the effective area and the container, reduce the heat exchange efficiency, and increase the fluid resistance; there is scale on the outer surface of the heat exchanger and The phenomenon of crystallization and precipitation occurs in the brine solution; the anti-rust paint of equipment and pipelines falls off, and rust occurs on the outer surface; mechanical impurities, lubricating oil, etc. enter the equipment, especially low-pressure equipment, the viscosity of the oil increases, plus The mixing of impurities can easily cause blockage of the pipeline.
The connection of each part of the refrigeration equipment is in a sealed state. If the sealing ability is lost, it will cause leakage and affect production; the pre-tightening force of the bolts of the flange does not meet the requirements, and the bolt connection is too loose, so the pre-tightening force cannot be guaranteed , Over-tightening may cause plastic deformation of the bolt or crush the packing. Therefore, due to the influence of vibration and high temperature, the pre-tightening force can also be gradually reduced. In addition, the flange bolts are rusted and other reasons to cause fatigue deformation and reduce the pre-tightening force; Weld cracks caused by fatigue and cold brittleness of metal materials; fillers at flanges or valve stems are corroded, worn or aged. Refrigeration equipment is corroded by the medium and rubbed by other objects, and it will decrease continuously. When the thickness is close to the minimum allowable value of strength calculation, the equipment should be used under reduced pressure or scrapped; cracks or needle-shaped holes often appear near welds, pipes Elbow, finned tube spot welding, and places where the antirust paint of equipment pipeline is severely corroded after peeling off, in addition, there are leaks in the seamless tube itself in very rare cases; when spot welding of finned tubes, care should be taken not to rub the tube wall. The melting is too heavy, resulting in thinning of the tube wall, and the corrosion of the metal causes pinholes to appear there. Zhongjing Global Purification can provide consulting, planning, design, construction, installation, transformation and other supporting services for sterile rooms and sterile workshops.
Preparations should be made in advance when repairing vessels, heat exchangers and pipes. Masks, rubber gloves, ventilators, etc. should be prepared for the ammonia system; This work must be done carefully, and each valve that is closed must be clearly marked to prevent the operator from opening the wrong valve when the equipment pipeline is repaired; the repaired container or pipeline should be evacuated. If the high-pressure liquid equipment such as For the maintenance of the high-pressure liquid storage tank, the liquid should be pumped out first, and the relevant valve connected with the condenser should be closed first, and the connection with the condenser should be cut off. Supply to each room of the cold storage; after the liquid is processed, the pressure in the barrel can be pumped directly to the pressure of the low-pressure system with the liquid supply pipe to observe the increase of the pressure in the barrel. Eliminate; if the pressure rise in the barrel is small, it can be considered that the valve is not leaking, and the remaining gas in the barrel can be put into the water through the oil drain pipeline and the relevant valve pipeline of the oil collector, and then repair the defect. Blowing is generally carried out with an air compressor, and its working pressure is 0.59MPa, and it is required to blow clean when blowing.
If you are looking to get started with CUSTOM SOLUTION SERVICES, it's important to find a quified . Let SUZHOU PHARMA MACHINERY CO.,LTD. be your provider. Visit us at PHARMA MACHINERY.
SUZHOU PHARMA MACHINERY CO.,LTD. is the major CUSTOM SOLUTION SERVICES provider. extraction machine businesses need the right tools at their disposal in order to handle extraction machine. PHARMA MACHINERY is your best choice.
To do that, SUZHOU PHARMA MACHINERY CO.,LTD. will need to make sure our business is listed accurately on as many directories as possible, including technology and quality.
SUZHOU PHARMA MACHINERY CO.,LTD. has a number of producing line for producing CUSTOM SOLUTION SERVICES.