loading

Focus on professional factory cleanroom workshop project and machinery only                          Phone: +86 18241958031    Email: pharma@sz-pharma.com          

Dynamic management of installation and construction of purification projects

by:PHARMA     2022-11-08
Since the change of subjective and objective conditions in the process of project implementation is constant, it is relative. In the process of project progress, the balance is temporary and unbalanced is permanent. Therefore, in the process of project implementation, the project objectives must be adjusted as the situation changes. Dynamic control. In the process of project implementation, the planned value and the actual value of the project target are compared regularly. When the deviation of the project target is found, corrective measures should be taken in time. That is to analyze the various influencing factors that may lead to the deviation of the project goal in advance, and take the best preventive measures against these factors. 1. Layer-by-layer decomposition of the installation and construction progress goals of purification projects To elaborate the process of planning different schedules for concentration. 2) During the installation and construction of the purification project, dynamically track and control the installation and construction progress goals of the purification project. ①According to the requirements of progress control, collect the actual value of the installation and construction progress of the purification project. ② Regularly compare the planned value and the actual value of the installation and construction progress of the purification project. According to the characteristics of this project, the control period of the progress can be set as ten days or half a month. When comparing the planned value and the actual value of the installation and construction progress of the purification project, it should be noted that the corresponding project content should be consistent. Values ​​are actual progress relative to milestone events or sub-items. The comparison between the planned value and the actual value of the progress should be a quantitative data comparison, and the results of the comparison are progress tracking and control reports, such as ten-day, monthly, quarterly, semi-annual and annual reports for the preparation of progress control. ③ Through the comparison between the planned value and the actual value of the installation and construction progress of the purification project, if the deviation of the progress is found, the corresponding rectification measures must be taken to rectify the deviation. 3) If necessary (that is, it is found that the original installation and construction progress target of the purification project is unreasonable) , or the original purification project installation and construction progress target cannot be achieved, etc.), then adjust the purification project installation and construction progress target. (1) The purification project installation and construction cost target is decomposed layer by layer, through the preparation of the purification project installation and construction cost planning, analysis and Demonstrate the possibility of realizing the cost target of purification project installation and construction, and decompose the cost target of purification project installation and construction. (2) Dynamically track and control the installation and construction cost targets of the purification project during the installation and construction of the purification project. ①According to the requirements of cost control, collect the actual value of the installation and construction cost of the purification project.
Custom message
Chat Online
Chat Online
Leave Your Message inputting...
Sign in with: