Cleanroom equipment installation

Installation of clean room equipment: 1. Clean room equipment should be stored in a cleaner environment before unpacking on site, and should be protected from moisture. Equipment should be removed from the outer packaging (except biological safety cabinets) in a designated uncontrolled environment, but the inner packaging must not be removed or damaged. The inner packaging of the equipment should be vacuumed from top to bottom in a controlled environment in the front room of the entrance, and then removed after cleaning. 2. The installation of clean room purification equipment should be completed after the interior decoration of the building and the construction and installation of the purification air-conditioning system, and after comprehensive cleaning and wiping, but the equipment connected to the enclosure structure or its exhaust and drainage pipes must be connected to the enclosure structure. At the same time, during construction, the arc transition should be made with the enclosure structure, the radius of curvature should not be less than 30mm, and the connection should be sealed to ensure strict cleaning. 3. If there are air pipes and water pipes in the biological safety cabinet of the clean clean room modular, they should be installed at the same time. When the exhaust branch pipes of multiple biological safety cabinets are connected to the closed exhaust riser pipes in the vertical shaft, the branch pipes should be equipped with a backflow prevention device, and should extend upwards at least 0.6m from the entrance of the riser. 4. After the clean clean room modular biological safety cabinet is installed in place, before connecting the exhaust duct, the installation frame of the high-efficiency filter and the entire filter element surface should be scanned for leaks. When there is a zero leakage exhaust device, the filter element surface should be leaked. 5. The installation of clean clean room modular equipment shall not affect the clean room parameters and service functions. When the equipment is installed, the purification air-conditioning system on site should have been running continuously for more than 24 hours. Any special equipment used for lifting, pulling or positioning of large equipment should be thoroughly cleaned before entering the clean room installation site, and should be inspected for scaling, peeling surfaces or materials unsuitable for a clean environment.

Look at the trends, both economic and consumer, for indications on your SUZHOU PHARMA MACHINERY CO.,LTD.'s staying power.

Dazzle your next event with extraction machine CUSTOM SOLUTION SERVICES and to buy best product, only trust SUZHOU PHARMA MACHINERY CO.,LTD..

These extraction machine CUSTOM SOLUTION SERVICES have made the life easier. The best feature of the is its extraction machine.

Provide CUSTOM SOLUTION SERVICES strategists with enough funds to adequately market our company and the products and services it provides.

GET IN TOUCH WITH Us
recommended articles
Project Oceania South America
SZ-PHARMA Cleanroom Series Products Reordered by long-term Customers!
As a powerful enterprise deeply engaged in the cleanroom field, we have always focused on the R&D, production and delivery of complete cleanroom products.
Understanding the Importance of Turnkey Cleanroom Projects

Discover how a carefully designed, professionally implemented turnkey cleanroom project can guarantee sterile products and higher standards of quality.
Electronic Cleanroom Air Conditioning System's Noise Control
In critical process areas such as photolithography areas, electron microscope rooms, and wafer inspection areas, even minute vibrations and low-frequency noise can cause image blurring and alignment errors.
Introduction to Negative Pressure Cleanrooms
Negative pressure cleanrooms are being applied more and more widely, mainly in hospital operating rooms and wards, pharmaceutical factories, biosafety laboratories, medical device production lines, etc.
Pharmaceutical Cleanroom Pressure Differential Control Key Elements
Pharmaceutical cleanroom require maintaining a pressure difference of at least 10 Pa between rooms of different cleanliness levels.
What Are the Types of Chilled Water Systems for Refrigeration and Air Conditioning?
As a core component of building central air conditioning systems, reasonable design and precise control of chilled water systems can significantly enhance energy efficiency.
no data
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2026 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
whatsapp
Contact customer service
Contact us
whatsapp
cancel
Customer service
detect