loading

Focus on professional factory cleanroom workshop project and machinery only                          Phone: +86 18241958031    Email: pharma@sz-pharma.com          

product-gmp cleanroom-PHARMA-img
Home  > PRODUCT  > Cleanroom Workshop  > ISO5-ISO8 Cleanroom  > 

GMP Standard Pharmaceutical Cleanrooms For Tablet Capsule Production

这里可以自定义设置
product-class 10000 clean room-PHARMA-img
product-PHARMA-gmp cleanroom-img
product-PHARMA-class 10000 clean room-img
product-PHARMA-GMP Standard Pharmaceutical Cleanrooms For Tablet Capsule Production-img
product-GMP Standard Pharmaceutical Cleanrooms For Tablet Capsule Production-PHARMA-img-1
product-gmp cleanroom-PHARMA-img-1
product-class 10000 clean room-PHARMA-img-1
GMP Standard Pharmaceutical Cleanrooms For Tablet Capsule Production
Brand name:
PHARMA CLEAN
Original:
Suzhou, China
Price:
USD 300-500/square meter
Payment:
T/T; Cash; Alibaba trade assurance
Delivery Time:
15-20 days, depending on the quantity
Supply Ability:
5000 square meters per month
Start Port:
Shanghai
Packing Details:
Carton packing, metal frame; plywood case
参数暂无数据

Add success, do you want to check your shopping cart?

暂无分享


  • After Warranty Service:Video technical support, Online support, Field maintenance and repair service

  • Warranty:1 year

  • Certification:CE ISO GMP

  • Usage: Tablet production line;formulation processing

  • Floor:PVC

  • Lighting:LED

  • Clean grade:From Class100-10000

  • Name:Cleanroom Project

  • Power Supply:200~240V

  • Type:Vertical Flow


product-gmp cleanroom-PHARMA-img


Limit Discounts

Limit Discounts


product-PHARMA-class 10000 clean room-img


Description

Description


This is a clean room full service construction under GMP request. Turnkey project. 

A Cleanroom or clean room is an environment, typically used in manufacturing or scientific research, that has a low level of environmental pollutants such as dust, airborne microbes, aerosol particles and chemical vapors. More accurately, a cleanroom has a controlled level of contaimination that is specified by the number of particles per cubic meter at a specified particle size. 

To give perspective, the ambient air outside in a typical urban environment contains 35,000,000 particles per cubic meter in the size range 0.5um and larger in diameter, corresponding to an ISO9 cleanroom, while an ISO1 cleanroom allows no particles in that size range and only 12 particles per cubic meter of 0.3um and smaller.

Airflow → primary air treatment → air conditioning → medium effect air treatment → fan air supply → purification duct → high efficiency air supply port → clean room → take away dust (bacteria) → return air duct → fresh air, primary air treatment.
Repeat the above process to achieve the purpose of purification.


product-class 10000 clean room-PHARMA-img
Characteristics

1. Adopt arc corner which is more suitable for the principle of clean room;

2. The system automatically controls operation, double door electronic interlock, equipped with photoelectric sensor, one-way

channel air shower room, entering from the non clean area, infrared induction after the door is closed, the door is locked after

the air shower, and only going out of the air shower room from the door;

3. Overall cold-rolled steel plate production, external surface electrostatic spray treatment;

4. The door, base plate and nozzle are all made of stainless steel, beautiful and generous;

5. Soft key touch time relay, LED display and setting of shower time, adjustable in the range of 10-99s, double door automatic

locking during shower;

6. Adopt primary and high-efficiency two-stage filtration system, with partition high-efficiency filter, with filtration efficiency of 99.99%, ensuring purification level;

7. The wind speed at the air outlet of the air nozzle is more than 25m / s, and the wind speed to the human body is more than 18m / S;

8. EVA sealing material, high sealing performance.

Technical Parameters

Technical Parameters


Ventilation frequency10-15 times per hour for one hundred thousand level;
15-25 times per hour for ten thousand level;
50-52 times per hour for thousand level;
0.25-0.35m / s for cross-section wind speed of one hundred level operating table.
Differential pressure≥5Pa for adjacent rooms in the main workshop.
Temperaturewinter> 16 ℃ ± 2 ℃; summer <26 ℃ ± 2 ℃;
Relative humidity45-65% (RH); noise ≤65dB (A);
Fresh air supply volume20% -30% of the total supply air volume;
Illumination≥300Lux.

Installation

Installation


product-PHARMA-gmp cleanroom-img

product-GMP Standard Pharmaceutical Cleanrooms For Tablet Capsule Production-PHARMA-img


product-PHARMA-GMP Standard Pharmaceutical Cleanrooms For Tablet Capsule Production-img


product-gmp cleanroom-PHARMA-img-1


product-PHARMA-class 10000 clean room-img-1

product-class 10000 clean room-PHARMA-img-1

product-PHARMA-gmp cleanroom-img-1


product-GMP Standard Pharmaceutical Cleanrooms For Tablet Capsule Production-PHARMA-img-1


In order to know your requirement, please fill the following table carefully and supply CAD layout, so that we can provide correct scheme and quotation, thank you!


How to get a quotation >>


Product Message
Product Message
Product Message
Chat Online
Chat Online
Leave Your Message inputting...
Sign in with: