loading

Focuses On Professional Cleanroom Project And Pharmaceutical Cleanroom Equipment.

FAQ Clean Room Construction Quality Control Can Be Divided Into Three Stages

The quality control of clean room construction can be divided into three stages: preparation stage, construction stage and acceptance stage.

1. Preparation stage

(1). Conscientiously do a good job of drawing review and technical disclosure

Fully understanding the design intention, doing a good job in the review of drawings and technical disclosure is an important technical link to ensure the quality of clean room construction. It is found to solve technical problems that are difficult to operate during construction, and lay a solid foundation for ensuring the quality of clean room construction. There will be various contradictions in the construction, and the construction party needs to cooperate with the design and construction parties to make reasonable changes on the premise of ensuring the construction quality of the clean room. For example, in the inspection of a clean room renovation and expansion project, it was found that the original designed air duct size could not be constructed in the ceiling of the main building where the floor height was limited. On the premise of quality, the size of the air duct is changed from square to flat, which not only meets the air volume requirements, but also ensures the construction ceiling height requirements.

(2). Strictly control the quality of materials and equipment

The clean room materials and equipment mainly include various decorative materials and air-conditioning equipment materials. Inspect and verify the requirements of construction quality acceptance specifications and design documents. The clean room should use materials that do not produce dust, do not accumulate dust, are corrosion-resistant, moisture-proof, mildew-proof, easy to clean and have fire-proof functions. Wood and gypsum boards cannot be used as surface decoration materials. Air conditioning insulation materials must also meet the relevant national regulations to meet the requirements of corrosion resistance, no dust production, no dust adhesion and fire protection.

Suzhou Pharma Machinery Co.,Ltd.

2022/06/12

Birkey


prev
FAQ The Principle Of Rotary Dehumidification Air Conditioner
What is GMP
next
no data
Get in touch with us
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2025 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
email
whatsapp
contact customer service
Contact us
email
whatsapp
cancel
Customer service
detect