Setting up a controlled environment is a challenge. If you get one step wrong in planning your cleanroom construction, it can lead to air leakage, audit problems, or even contaminations that can put the production process on hold.
Whether it's a small assembly cell or a large scale pharmaceutical plant, it's a lot of trouble if the information is wrong from the start. These are 7 practical turnkey cleanroom project tips that will help keep you on schedule, on budget and fully compliant.
Do not order materials or begin framing until you are sure you know what level of cleanliness is required for your process. The ISO cleanroom standards allow only a certain number of airborne particles per cubic meter of space.
You don't need to over-engineer your space and spend a lot of money on HVAC units and HEPA filters you don't need. Under-engineering means your product yield will be compromised.
ISO 5 clean room: Needed for aseptic drug filling, semiconductor wafers and sensitive optics. This is equal to 240 to 480 air exchanges per hour.
ISO 6 clean room: Frequently employed in medical device assembly, micro-electronics and specialty compounding.
ISO 8 clean room: Baseline standard for general pharma production, food packaging areas and support rooms.
| ISO Cleanroom Class | Air Changes Per Hour (ACH) | Common Practical Application |
|---|---|---|
| ISO 5 | 240 - 480 | Sterile drug filling, semiconductor wafers |
| ISO 6 | 150 - 240 | Medical device packaging, optical manufacturing |
| ISO 7 | 60 - 90 | Biopharma prep areas, surgical tool assembly |
| ISO 8 | 5 - 48 | Secondary packaging, raw material storage |
Understanding the difference between an ISO 5 workspace and a cleanroom ISO 8 zone helps to keep your HVAC sizing realistic from the beginning!
There is no place for standard drywall in today's high purity facilities. Drywall generates millions of smaller particles during construction and painted drywall chips absorb moisture and off-gas over time.
With a modular cleanroom panel design, everything changes:
Quick installation: Wall panels are prefabricated and simply snap together on the job site in less than half the time required for installation labor.
Flush finishes: Smooth joint locks are used on high-grade panels, with no edges or ledges for dust to hide.
Easy layout changes: Want to expand your ISO 6 footprint next year? Unlike regular walls, modular walls can be unbolted and removed from place without leaving behind drywall dust.
Core options: Use Rockwool cores for highest fire resistance, or aluminum honeycomb cores for durability.
Your cleanroom hvac systems are not simply intended for cooling the room. It's the center of your complete contamination management solution. It regulates the air changes, maintains a controlled humidity level, and expels stray particles.
Air should always flow from your cleanest rooms toward your less clean rooms. This means that your ISO 5 clean room should have a higher pressure than the ISO 8 clean room gowning area. This positive pressure barrier prevents dirty air from flooding in when doors are opened by the user.
Consider fan filter units (FFUs), duct paths and ceiling filter locations early on. Having the proper air balance on paper means no expensive rework during final room testing.
When HVAC design and wall panel installation is outsourced to one contractor, and electrical and room certification work is outsourced to another, it becomes a game of finger pointing. In the event of an air leakage or pressure test failure, vendors blame one another.
Full cleanroom turnkey solutions eliminate the middle man friction. One team is dedicated to the design, engineering, supply of materials, mechanical set-up and end-to-end room validation.
Having one contract control your clean room job ensures that schedules are kept on track and your budget is not undermined by “change orders”.
When considering air filters and wall panels, it's easy to overlook the surfaces beneath your feet and above your head. However, floors and lighting areas suffer from the most wear over time.
Don't use tile floors at all. Grout lines are breeding ground for bacteria. Use only seamless poured epoxy or heavy vinyl coved base.
Use flush-mount LED fixtures and mount directly to ceiling grid for lighting. Sealed, top-serviceable light panels let your maintenance personnel replace power drivers from above without entering your cleanroom.
Generally, the contamination of a cleanroom originates from human activities rather than from the machinery. Your body is shedding thousands of skin cells each minute and your facility should not allow those particles to enter product areas.
Your cleanroom construction layout should have distinct transition steps, such as:
➤Pre-gowning entry: Area for removal of street shoes, washing of hands, and dropping off outer coats.
➤Primary Airlock: Positive-pressure rooms for putting on suits, hoods, boots, and gloves.
➤Pass-Through Cabinets: Sealed, double-door interlock boxes mounted in the wall so staff can move raw materials into the room without repeatedly stepping in and out.
The logical and intuitive layout of traffic paths helps to keep the cross contamination numbers very low.
Cleanroom requirements can differ depending on the market you're selling to. For example, if you are manufacturing medical devices you will have to review FDA requirements in addition to European regulations. A quick look at some technical materials, such as this guide to ISO cleanroom classification for medical device manufacturing, will make sure your layout is in line with international standards.
In addition, there are significant variations in operational quality across markets. Learning and knowing the fundamental differences in specifications for cleanrooms between the FDA and EU GMP avoid needless and costly retrofits later.
Lastly, plan for expansion. Install additional utility lines behind your wall panels now and allow for additional space in the mechanical room for an additional air handler in case you expand your production.
What are the advantages of modular cleanroom walls over regular built-in walls?
They are pre-made in a factory, and don't create construction dust during installation, thus making the process clean and quick. They are moisture resistant, strong disinfectants, keep smooth flush joints and allow you to rearrange your room later without breaking down the space.
How can I determine whether I should use ISO 5, ISO 6 or ISO 8?
It depends on your process needs and regulations in your industry. Sterile drug fill lines and microchips require an ISO 5 environment. Medical device assembly usually runs in ISO 6 or ISO 7 setups. Basic packaging and raw material storage generally land in an ISO 8 clean room.
What does a turnkey cleanroom build actually cover?
A complete cleanroom turnkey project handles your project end-to-end. That includes early engineering designs, panel installation, HVAC and duct integration, electrical work, pressure balancing, and complete operational testing for final certification.
A successful cleanroom project boils down to a mix of strong materials, intelligent air flow and good project management. Modular panel systems and collaboration with an experienced turnkey service provider ensures that your build stays fast, clean and fully compliant.
If you are looking for dependable cleanroom turnkey project execution, engineered wall systems, or customized clean room solutions, check out our panel options and project engineering support at SZ Pharma. Let's get your facility up and running.