Foreign clients have requested us to send engineers to their local sites for debugging.

After preparing in advance for a month, our engineer departed on time

After a 24-hour journey, we successfully arrived at the customer's factory

After a careful inspection of the cleanroom and HVAC system, we gradually began the debugging work

We encountered many problems during the debugging process, but with our close cooperation with the customer's factory, we have resolved all the issues

Debugging the central air conditioning system is an important step in ensuring its normal operation and efficient functioning. The following are the basic steps for debugging the central air conditioning system:

1. Check equipment installation: First, ensure that the central air conditioning equipment is correctly installed and connected. Check whether the installation position, pipeline connection, and electrical connection of the equipment meet the requirements. Check equipment installation: First, ensure that the central air conditioning equipment is correctly installed and connected. Check whether the installation position, pipeline connection, and electrical connection of the equipment meet the requirements.

2. Check gas and power supply: Check if the gas and power supply is sufficient and stable. Ensure that each device can obtain the required gas and electricity normally. Check gas and power supply: Check if the gas and power supply is sufficient and stable. Ensure that each device can obtain the required gas and electricity normally.

3. Debugging fans and pumps: Debug each fan and pump one by one to ensure that they can operate normally. Adjust the speed, direction, and control parameters of the fan and water pump to meet the design requirements. Debugging fans and pumps: Debug each fan and pump one by one to ensure they can operate normally. Adjust the speed, direction, and control parameters of the fan and water pump to meet the design requirements.

4. Debugging sensors and controllers: Calibrate sensors and debug controller settings. Ensure that sensors accurately measure parameters such as temperature, humidity, and pressure, and make appropriate responses and adjustments through the controller. Debugging sensors and controllers: Calibrate sensors and debug controller settings. Ensure that sensors accurately measure parameters such as temperature, humidity, and pressure, and make appropriate responses and adjustments through the controller.

5. Check pipelines and valves: Check whether the pipeline connections are tight and whether the valves are opened or closed correctly. Ensure that the condenser and cold air can flow normally in the pipeline and adjust as needed. Check pipelines and valves: Check whether the pipeline connections are tight and whether the valves are opened or closed correctly. Ensure that the condenser and cold air can flow normally in the pipeline and adjust as needed.

6. System testing: Test the entire system, including starting the system, observing the working condition of each device, adjusting various control parameters, and ensuring that the system can maintain stable operation. System testing: Testing the entire system, including starting the system, observing the working condition of each device, adjusting various control parameters, and ensuring that the system can maintain stable operation.

Details of Debugging the Central Air-conditioning System 1

Suzhou Pharma Machinery Co.,Ltd.

2025/01/27

Gino

prev
Acceptance Criteria for Sandwich Panels
Air Conditioning System Design Process
next
no data
Get in touch with us
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2025 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
email
whatsapp
contact customer service
Contact us
email
whatsapp
cancel
Customer service
detect