loading

Focuses On Professional Cleanroom Project And Pharmaceutical Cleanroom Equipment.

Air Purification System Installation and Commissioning

The air purification system can directly determine whether the clean room is qualified, so the actual installation and commissioning process is particularly important. In order to achieve the purification effect, the installation process and requirements must be strictly followed.

When customers receive the equipment of the air purification system, they should first check all equipment and parts according to the cargo list to confirm that nothing is missing, then prepare the tools, and make a complete construction plan. Do not rush to install. If errors are found during the installation process, all previous work will fail. Wipe all equipments and parts before installation to avoid accidents caused by wiping after installation.

When installing the primary filter, medium filter and high efficiency filter, ensure that the installation is firm, the sealing is good, and the installation position is easy to replace and clean. Install the ventilation ducts and air outlets according to the design drawings. Ensure that the duct connection is well sealed to prevent duct air leakage or external dust from invading the room. After installation, all ducts should be kept in the same plane and at the same height so that the air in the pipes can flow smoothly. After the air conditioner, filter, and ventilation pipes are all installed, the control box and intelligent control system should be installed.

After the overall installation of the whole home air purification system, it is debugged to test whether the temperature, humidity, air volume, pressure and other values meet the requirements. Test the number of dust particles, air cleanliness, and airflow speed to ensure that all data meet the requirements of the cleanroom. It is worth noting that each single machine must be tested before installation to avoid being unable to find the cause of the abnormality after the installation. After the debugging and testing, confirm that the installation is correct and provide basic training for staff, let them know ow to operate, how to replace the filter, and inform the emergency handling measures, so that staff have a basic understanding of the entire medical air purification system.

The construction of cleanroom is complex and rigorous process, no mistakes allowed. Every equipment and every part has strict requirements, installation requirements must be followed to create standard cleanroom. Suzhou Pharma can not only provide you with cleanroom design solutions and products, but also provide you with installation guidance or engineer door-to-door installation services. The moment you choose Suzhou Pharma, it means that you can harvest a perfect turn-key project for clean room.


Air Purification System Installation and Commissioning 1
Air Purification System Installation and Commissioning 2
Air Purification System Installation and Commissioning 3
Air Purification System Installation and Commissioning 4

Suzhou Pharma Machinery Co.,Ltd.

2024/11/08

Icey

prev
How to Design Air Purification System for Clean Workshop?
Hand Dryers——The Guardian of Cleanroom
next
no data
Get in touch with us
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2024 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Customer service
detect