This is the first Monday after the 24th Chinese National Day holiday, and we started production of goods last week.
Last weekend, we had already completed production. After finishing production ahead of schedule, we conducted quality inspection and packaging work. We have loaded a large amount of clean room building materials and china clean room equipment this time.
After they arrive at the customer's factory, we will dispatch our engineers to assist the customer in completing the installation and equipment debugging work together.
The debugging and operation of the constant temperature and humidity air conditioning and dehumidifier in the clean room are very important and complex. We can dispatch our professional team of service engineers to provide our clients with comprehensive clean room commissioning services.
1. Construction preparation
Before formal construction, construction preparation must be carried out first. This includes understanding customer needs, determining cleanliness requirements, cleanroom area, process flow, etc., and developing detailed cleanroom engineering plans. In addition, corresponding construction materials, equipment, and tools should be prepared according to the design drawings.
2. Structural construction
Structural construction is the foundation of a dust-free and clean purification workshop. This mainly includes the layout of the clean room, the construction of walls, ceilings, floors, and other structures. During the construction process, it is important to ensure that the structure meets cleanliness requirements and pay attention to material selection and installation details.
3. Construction of air treatment system
The air handling system is the core part of a clean room, mainly including air filters, air conditioning equipment, duct systems, etc. During the construction process, air filters must be installed strictly in accordance with the design requirements to ensure the effectiveness of air purification. At the same time, it is necessary to control the temperature, humidity, and air flow to meet the requirements of the clean room.
4. Construction of lighting system
The lighting system is an important component of a clean room and needs to be designed according to cleanliness requirements, providing sufficient lighting intensity and considering energy efficiency. During the construction process, it is necessary to ensure that the lighting equipment is installed firmly and the wiring is connected correctly.
5. Dust control construction
Dust control is a crucial step in clean room construction. To design dust control measures, such as sealed doors and windows, insect screens, air outlet filters, etc., to prevent external pollutants from entering the dust-free clean purification workshop.
6. Material selection and construction
According to the design requirements, select materials that meet the cleanliness requirements, such as wall coatings, flooring materials, etc. that are easy to clean, antibacterial, and dustproof. During the construction process, it is necessary to ensure that the materials are installed firmly, the joints are tight, and meet the requirements of the clean room.
7. Equipment installation and debugging
Install production equipment, conveyor systems, workbenches, etc. according to the needs of the process flow. During equipment installation, it is necessary to ensure levelness and verticality to ensure the normal operation of the equipment. Debugging and testing are carried out after the installation of equipment, mainly including the debugging of air handling systems, lighting systems, and other equipment to ensure their normal operation.