Focus on professional factory cleanroom workshop project and machinery only                          Phone: +86 18241958031    Email: pharma@sz-pharma.com          

PHARMA  >  AI - Page Sitemap  >  PHARMA cleanroom cleaning procedure supply for chemical plant
PHARMA cleanroom cleaning procedure supply for chemical plant

PHARMA cleanroom cleaning procedure supply for chemical plant

Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:


  • After Warranty Service:Video technical support, Online support, Field maintenance and repair service

  • Warranty:1 year

  • Certification:CE ISO GMP

  • Usage:Laboratories

  • Floor:PVC

  • Lighting:LED

  • Clean grade:From Class100-10000

  • Name:Cleanroom Project

  • Power Supply:200~240V

  • Type:Vertical Flow


PHARMA cleanroom cleaning procedure supply for chemical plant-1


Limit Discounts

Limit Discounts


PHARMA cleanroom cleaning procedure supply for chemical plant-2


Description

Description


The plane and space design of the clean laboratory will arrange the clean experimental area and personnel purification, equipment and material purification and other auxiliary rooms in different areas. At the same time, the comprehensive coordination effects of various technical facilities, such as experimental operation, process equipment installation and maintenance, air distribution type, pipeline layout and purified air conditioning system, are considered.


PHARMA cleanroom cleaning procedure supply for chemical plant-3
Characteristics


1. Reasonable use of laboratory space layout

2. Meet the laboratory working environment, combined with ergonomics

3. Meet the safety requirements of the test environment


If you want clean room for your Pharmaceutical or Related factory/Hospital/

Electric product factory/Plant growing green house...etc,You need provide these basic information to us:


1.What size clean room do you want to build?Do you have layout drawing?

2.What temperature and humidity do you want for your clean room?Whats local temperature and humidity?

3.What product or work will be do in the clean room?

4.Do you have factory now or just ground?

5.Whether have other special requirement?

Technical Parameters

Technical Parameters


ApplicationSolid formulations,tablets, capsules, powder formulations,etc.
Wall MaterialSandwich panel
Frame Material304 Stainless Steel/Aluminum alloy profile
CleanlinessFrom Class 100 to Class 10,000,0
Power110V/60hz/av/dc, 220V/60HZ/AV/DC
FFU2*4ft/4*4ft
HEPA FilterH14 Hepa filter
LightingAvailable in LED and T5
SizeCustomize

Installation

Installation


PHARMA cleanroom cleaning procedure supply for chemical plant-4

PHARMA cleanroom cleaning procedure supply for chemical plant-5


PHARMA cleanroom cleaning procedure supply for chemical plant-6


PHARMA cleanroom cleaning procedure supply for chemical plant-7


PHARMA cleanroom cleaning procedure supply for chemical plant-8

PHARMA cleanroom cleaning procedure supply for chemical plant-9

PHARMA cleanroom cleaning procedure supply for chemical plant-10


PHARMA cleanroom cleaning procedure supply for chemical plant-11


In order to know your requirement, please fill the following table carefully and supply CAD layout, so that we can provide correct scheme and quotation, thank you!


How to get a quotation >>



PHARMA class 8 cleanroom requirements is carefully designed. It is designed by our experts who master knowledge in part tolerances, mechanical analysis, fatigue analysis, functional realization, and more. We provide one stop service of Design-Prototype-Injection mould
The manufacturing standards for PHARMA cleanroom cleaning procedure is very high. They are based on different DIN-, EN- and ISO-Standards, concerning execution, design and technological premise. Prototype is made by CNC Milling,and the involved surface finishing including polishing, painting, the logo sticking
Comprehensive tests are carried out on PHARMA cleanroom cleaning procedure. They are furniture mechanical safety test, ergonomic and functional evaluation, contaminants and harmful substances test and analysis, etc.
A complete furniture testing is performed on PHARMA class 8 cleanroom requirements. They are mechanical testing, chemical testing, flammability testing, surface resistance testing, etc. Prototype is made by CNC Milling,and the involved surface finishing including polishing, painting, the logo sticking
PHARMA class 8 cleanroom requirements comes with many optional accessories in the manufacturing process. Ventilated sunscreen façades, shutters, natural zenital lighting, wind-energy exhaust systems, green or living walls and roofs, together with other features using efficient energy kits, are all optional choices.
We not only have long-term stable raw material suppliers and multiple automated mechanical production equipment, but also established a complete cost control system, which effectively reduces production costs, so the class 8 cleanroom requirements we produce is cheaper than similar products.
Product Message
Chat Online
Chat Online
Leave Your Message inputting...
Sign in with: