loading

Focuses On Professional Cleanroom Project And Pharmaceutical Cleanroom Equipment.

Installation of sterile workshop and water treatment equipment

Installation of sterile workshop and water treatment equipment

In the air-conditioning system, treatment equipment should be installed to remove salts such as calcium and magnesium, and water treatment equipment should also remove impurities such as suspended solids, organic matter and gas in water; various tanks of water treatment equipment are installed on the floor or concrete On the basis, the pouring foundation can be buried according to the outrigger column of the tank...

Text label: Aseptic workshop installation, water treatment equipment installation, Zhongjing Global purification

Aseptic pharmaceutical cleanroom and water treatment equipment installation

In the air-conditioning system, treatment equipment should be installed to remove salts such as calcium and magnesium, and water treatment equipment should also remove impurities such as suspended solids, organic matter and gas in water; various tanks of water treatment equipment are installed on the floor or concrete On the basis, the pouring foundation can be buried with anchor bolts or steel plates according to the outrigger columns of the tank. The surface of the foundation should be flat, the foundation height of similar tanks should be the same, and the foundation concrete should be installed when it reaches more than 75% of its strength; The pipes connected to the equipment should be connected after the pressure test and flushing; the hoisting of the water treatment equipment should pay attention to protecting the equipment's instruments and glass observation holes and other parts. To prevent the equipment from freezing, the water in the equipment should be emptied.

Water system accessories generally include decontamination devices, water separators, heat exchangers, water tanks, etc. When the water tank is installed as a whole, the equipment can be hoisted in place and leveled; for the water tank installed as a whole or made on site, the inner surface of the water tank should be painted twice according to the design requirements. If the outer surface is not insulated, then paint oil. Mix the paint twice, and brush the asphalt paint twice on the bottom of the water tank; after the water tank is leveled and aligned, the water inlet pipe, water outlet pipe, sewage pipe, water level signal pipe, etc. can be installed according to the drawings.

, and then carry out the hydraulic test according to the system; the water tank that needs to be insulated should be insulated. Generally, the surface area of u200bu200bthe water tank is large, and the insulation layer is easily separated from the equipment due to thermal expansion. To fix the insulation layer, the distance between the hooks and nails is generally 200-250mm, the height of the hooks is equal to the thickness of the insulation layer, and the outer protective shell is wiped. In order to facilitate the necessary maintenance of the decontamination device during the operation of the system, the decontamination device should be equipped with a bypass pipe; when installing the decontamination device, the heat medium should enter from outside the grid of the pipe, and it should be cleaned after the system pressure test and flushing; The quality of the decontamination device is large and should be installed on a special bracket, but the installed bracket should not hinder the sewage removal work of the decontamination device. Zhongjing Global Purification can provide consulting, planning, design, construction, installation, transformation and other supporting services for sterile workshops and sterile rooms.

The water separator is a pressure port container. It must be opened and connected to the valve during processing. The short pipe of the pressure gauge, thermometer and water outlet must be processed at one time. On the bracket, when the diameter of the water separator is D≥350mm, it should be supported by a 50*50*5 angle steel column from the ground, and sometimes it is also installed on the angle steel bracket of the concrete foundation, and fixed with a round steel V-shaped clamp; the water separator is insulated. During construction, rust should be removed first, then two coats of Zhangdan should be applied and the steel wire mesh should be wrapped. Then, the asbestos ash and mud should be evenly spread on the wire mesh, with a thickness of about 50mm, and a 10mm thick asbestos cement protective shell on the outermost part. Smooth and smooth, with uniform thickness; when installing the water separator, the slope should be kept at about 1%, and it should be sloped towards one end of the sewage pipe. After the installation is completed, it should be tested with the pipeline system; the height of the water separator support should not be greater than 1m.

The decontamination device for chilled water and cooling water should be installed on the pipeline before entering the unit. The direction is correct and easy to clean. The connection with the pipeline should be firm and tight. The material, specification and wrapping method of the filter screen should meet the design requirements; the closed system pipeline should be equipped with an exhaust valve at the highest point of the system and all high points where air may accumulate, and a drain pipe and a drain valve should be installed at the lowest point of the pipeline. ; Installation of water tank, water collector, water distributor, cold storage tank and other equipment, the size and position of the bracket or base meet the design requirements, the equipment is in close contact with the bracket or base, the installation is flat and firm, and the allowable deviation of the plane position is 15mm, The allowable deviation of elevation is ±5mm, and the allowable deviation of verticality is 1/1000. The installation position and connection of expansion tank should meet the requirements of design documents.

This is an global standard which acts as a form of promise that SUZHOU PHARMA MACHINERY CO.,LTD. manufatures according to the finest quality standards.

SUZHOU PHARMA MACHINERY CO.,LTD. take prudent risks and work together to assure our success and profitability in the future.

Your co-workers, investors and clients have busy schedules, and it can be hard to get everyone in the same place at the same time for CUSTOM SOLUTION SERVICES. So, it is important to create a connection between company and clients.

GET IN TOUCH WITH Us
recommended articles
Project
no data
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2025 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
email
whatsapp
contact customer service
Contact us
email
whatsapp
cancel
Customer service
detect