Installation of combined purification air-conditioning unit in clean room workshop

Installation of combined purification air-conditioning unit in clean room workshop

Combined purification air-conditioning units with small air volume are components that leave the factory and are installed on site. Similar to general combined air-conditioning units, they are composed of different functional sections; combined purification air-conditioning units with large air volume are sometimes used. Parts shipped from the factory, assembled on site,...

Text label: clean clean room modular air conditioning unit installation, clean workshop combined purification air conditioning unit

Installation of combined purification air conditioning unit in clean room workshop

Combined purification air-conditioning units with small air volume are components that leave the factory and are installed on site. Similar to general combined air-conditioning units, they are composed of different functional sections; combined purification air-conditioning units with large air volume are sometimes used. The parts are shipped from the factory and assembled on site, and the wall panels of the unit are made of composite panels; the connections between the various sections of the unit are usually bolted, and the joints are sealed with sponge rubber sheets. Usually, the manufacturer sends people to install or send technicians to guide the installation. ;The foundation should be made of reinforced concrete, the length and width of the foundation should be increased by 100mm than the length and width of the unit shape, the height of the foundation should be determined according to the water seal of the condensate drainage pipe and the drainage slope, the foundation plane should be flat, and the horizontal error of the foot line should be determined. It should not be larger than 5mm. In order to protect the floor of the unit from corrosion, two I-beams or channel steels of suitable size should be placed at the lower part of the unit; in the lower part of the surface cooler, heating and fan section, the cushioned steel should be added as appropriate, and under the fan Horizontal section steel is also required to increase the strength. The construction error of the foundation plane can also be eliminated by adjusting the section steel. The I-beam or channel steel under the unit should be treated with anti-corrosion and anti-rust treatment.

For the installation of the combined air-conditioning unit that leaves the factory, in principle, it should be installed in sequence from one end to the other. However, since the surface cooler, heater, fan and its base are heavy, it is necessary to install the floor of this part. These equipment should be hoisted first; the fan and motor have been assembled on the vibration-damping base by the manufacturer, and do not need to be disassembled during installation unless the size is too large and the door is restricted. When disassembling and installing, the motor should be adjusted before assembling the side panel. After these major components are installed in place, remove the hoisting equipment, install all the bottom plates, level and align, and seal the joints; the power cable inlet of the unit should be passed through the wire tube and tightly sealed, and the wire tube should be extended. To the motor junction box, the shock absorber of the fan should be protected during the installation process, and the rigid protection block should be removed after the fan is in place, so that the shock absorber can be evenly stressed; the slope of the stainless steel condensate pan under the surface cooler should be adjusted. Well, to ensure that the condensate drains smoothly. Zhongjing Global Purification can provide consulting, planning, design, construction, installation, transformation and other supporting services for clean rooms and clean workshops.

When assembling the box body panels, the dust on the wall panels and various parts should be wiped off at any time, and the sealing materials should be checked at any time to see if they are neat and undamaged, otherwise they need to be replaced; after the box body is assembled, the access door is installed in place , The interior of the combined air-conditioning unit should be cleaned again, the temporary protective film on the surface cooler, heater, etc. should be torn off, put on clean work clothes and work shoes, installed primary and medium-efficiency filters, connected to the power supply and repaired for safety. After the installation of lamps and air-conditioning units, the air leakage detection should be carried out together with the supervisor; the inlet and outlet water pipe interfaces of the surface cooler and heater of the combined purification air-conditioning unit are usually external thread interfaces. During the pipeline installation process, due to the on-site threading equipment Most of the maximum pipe diameters can not meet the pipe diameter requirements of the water pipe interface. Some units use lathes to process the threads of the connecting pipe sections and use pipe hoop threads to connect. If there are errors in the thread processing, it is easy to leak water during the pressure test. , so many construction units usually use flange connection for these large diameter threaded interfaces, which is convenient and reliable, and also eliminates the need to install union pipe fittings for threaded connections, resulting in an increase in installation length; When welding flanges at the water pipe joints of the surface cooling section and heating section of the air-conditioning unit, special attention should be paid to the protection of the box wall. Usually, multi-layer soaked asbestos cloth can be used to close and cover the wall at the water pipe joint. Cover with a metal plate.

SUZHOU PHARMA MACHINERY CO.,LTD. promises that we will manufature our products in accordance with the strictest quality standards.

SUZHOU PHARMA MACHINERY CO.,LTD. intends to make enough profit to generate a fair return for our investors and to finance continued growth and development in CUSTOM SOLUTION SERVICES.

Many of the CUSTOM SOLUTION SERVICES listed here can be purchased for less money, but in general we recommend paying a slightly higher price for significantly improved performance. These are our top choices and their recommended configurations.

GET IN TOUCH WITH Us
recommended articles
Project
Clean Room Pressure Difference Influencing Factors And control Methods
A professional clean room must control the pressure difference to ensure that air flows from clean areas to non clean areas and from high cleanliness areas to low cleanliness areas during normal use, thereby maintaining clean air in the clean room at all times.
In depth Analysis of Sterile Isolators
Aseptic isolators are enclosed spaces composed of rigid and/or flexible barrier materials. They contain an integrated vaporized hydrogen peroxide (VHP) sterilization system, which can repeatedly sterilize the air inside the isolator and effectively exposed surfaces to remove the bioburden.
Clean Room PVC Floor
Cleanroom pvc flooring is a polyvinyl chloride (PVC) material specifically designed for clean room environments. It has a high density and smooth surface.
Thoughts on the Applicability of Laminar Flow Interference Testing in Clean Areas

In clean area management and quality control, laminar flow interference testing has received much attention, and whether it is only applicable to Class A laminar flow remains to be considered.
no data
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2025 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
email
whatsapp
contact customer service
Contact us
email
whatsapp
cancel
Customer service
detect