Focuses On Professional Cleanroom Project And Pharmaceutical Cleanroom Equipment.

Hygiene management of clean room and clean area

Hygiene management of clean room and clean area

The hygiene management of the clean area of u200bu200bthe clean clean room modular not only meets all the requirements of the hygiene management of the general production area, but also other requirements of the hygiene management of the clean area. The doors of each studio in the clean area should be in production or non-production Timely shut down; all utensils, containers in the clean area...

Text label: clean clean room modular design and installation, clean area hygiene management, clean room decoration

Clean room clean area hygiene management

The hygiene management of the clean area of u200bu200bthe clean clean room modular not only meets all the requirements of the hygiene management of the general production area, but also other requirements of the hygiene management of the clean area. The doors of each studio in the clean area should be in production or non-production Close in time; all utensils, containers, equipment and tools in the clean area must be made of materials that are not easy to generate dust, and cleaned according to the prescribed procedures before entering the clean area; the use of concave and convex surfaces that are not easy to clean should be minimized. Facilities; the air conditioner in the clean area runs continuously, and the air conditioner is operated by the duty fan when the production is intermittent, so that the clean room can maintain positive pressure. The clean room must not be arranged for three shifts of production, and there must be enough time for cleaning every day. Enough time to clear and clean the site; enter and exit the clean area, follow the changing procedure for entering the control area, enter the clean area, and after disinfection, do not do any actions unrelated to production, and do not touch non-production items again; clean clothes are required not to lose fiber, not to Electrostatic adhesion particles are generated, and there is no obvious wear and tear; the work clothes in the clean area have no pockets, simple lines, no exposed fibers at the seams, and the collar should be fastened with cuffs and trousers. Wear and leave the clean area; the work clothes in the clean area are washed in the clean area, and the washed work clothes are put into a special clean plastic bag.

General production areas require doors, windows and walls to be clean and hygienic, tools, workbenches, work cabinets clean, lamps clean, the ground level and clean, free of debris, mice, ants, etc.; It is strictly forbidden to enter the production workshop without wearing work clothes, shoes and hats, and all non-production items shall not be brought into the workshop, smoking, eating, sleeping, meeting guests, or engaging in activities unrelated to production shall not be allowed in the workshop; The general production area should have corresponding sanitary tools, which must be cleaned in time after use and stored in the specified location. Non-production personnel are not allowed to enter the general production area without permission, and must be approved by the production site management personnel. Zhongjing Global Purification can provide consulting, planning, design, construction, installation and transformation of clean rooms and clean workshops and other supporting services.

All studios entering the clean area must change clothes in accordance with the 'Clothing Procedures for Entering the Production Control Area'. The changing rooms in the clean area are separated for men and women. There are shoe changing rooms, first changing rooms, and second changing rooms. The shoe changing room is equipped with shoe lockers. , The outer cabinet of the shoe cabinet is used to store employees' own shoes, and the inner cabinet stores work shoes, which must not be misplaced. Keep the changing room and changing room clean and hygienic. It is not allowed to store items that are not required by the room. It is not allowed to bring personal items into the second changing room, especially food is strictly prohibited. Clean the doors and windows thoroughly once a week; the cleaning of the locker room is carried out in accordance with the 'Locker Cleaning Procedures'. The wash basin in the locker room is for employees to wash their hands and disinfect their hands on and off work. It is not allowed to wash other items in the wash basin of the locker room. To wash the sink once a day. The workshop must be equipped with temporary storage for dirt and waste. The dirt and waste generated during production shall not be thrown or placed indiscriminately. It must be cleaned up at any time and placed in the temporary storage. The sanitation personnel must clean up the waste storage before going off work every day. , Clean the dirt and waste out of the production workshop; the production workshop is equipped with a dirt and waste outlet, which must be operated correctly to prevent the air from flowing back.

If you are a extraction machine fan, you definitely want to enjoy the best possible. The that you choose plays a major role with the kind of experience you have when using it.

With all the pros and cons of different in mind, click PHARMA MACHINERY to learn more about and decide which CUSTOM SOLUTION SERVICES option is best for your case.

extraction machine has become a serious problem for an increasing number of people around the world, that's why highly effective are developed by SUZHOU PHARMA MACHINERY CO.,LTD..

SUZHOU PHARMA MACHINERY CO.,LTD. deems CUSTOM SOLUTION SERVICES as evolutionary rather than revolutionary. We've always had these 'social commerce' marketplaces in some form.

The group's Quality Systems Manager (QSM) is responsible for ensuring that SUZHOU PHARMA MACHINERY CO.,LTD. has in place systems that guarantee quality throughout the Group.

GET IN TOUCH WITH Us
recommended articles
Project
Clean Room Pressure Difference Influencing Factors And control Methods
A professional clean room must control the pressure difference to ensure that air flows from clean areas to non clean areas and from high cleanliness areas to low cleanliness areas during normal use, thereby maintaining clean air in the clean room at all times.
In depth Analysis of Sterile Isolators
Aseptic isolators are enclosed spaces composed of rigid and/or flexible barrier materials. They contain an integrated vaporized hydrogen peroxide (VHP) sterilization system, which can repeatedly sterilize the air inside the isolator and effectively exposed surfaces to remove the bioburden.
Clean Room PVC Floor
Cleanroom pvc flooring is a polyvinyl chloride (PVC) material specifically designed for clean room environments. It has a high density and smooth surface.
Thoughts on the Applicability of Laminar Flow Interference Testing in Clean Areas

In clean area management and quality control, laminar flow interference testing has received much attention, and whether it is only applicable to Class A laminar flow remains to be considered.
no data
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2025 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
email
whatsapp
contact customer service
Contact us
email
whatsapp
cancel
Customer service
detect