Today we will show that how to install our steel structure factory building on an open space in our video.
Before our engineers arrived at the client's site, the client had already built two concrete platforms on the land according to our requirements for installation.
Welcome to SUZHOU PHARMA MACHINE clean room construction showing.
This is a outdoor use warehouse and building by modular clean room standard.
First we make a Cement concrete base ensures sufficient and safe support for the overall weight of the clean room from the ground.
The second part starts to install the main steel structure frame for high-strength typhoon release.
The third part starts installing wall panels and doors and windows.
Then start installing the roof and suspended ceiling.
Please follow us, we will bring you follow-up content and various videos about the clean room.