How to accept the dust-free workshop project

After the dust-free workshop project is completed, it must be checked and accepted according to the standards. Only in this way can we ensure that no problems will occur in the dust-free workshop when it is used in the future. The standard requires that sometimes it is only through the naked eye how to judge whether the clean room project is qualified or not, and only by following the following principles to make judgments, as follows: the completion acceptance of the clean room project, and the third-party inspection will check various types of completion acceptance. Materials, generally including the following documents: 1. Drawing review records, design change notices and as-built drawings; 2. Main materials, equipment, finished products, semi-finished products, instruments, and instruments. 3. Concealed engineering inspection and acceptance records; 4. Engineering equipment, components, accessories, dust-free workshop walls, ceilings, doors and windows, as well as phoenix system, piping system installation and inspection records; 5. Pipeline test records, high-purity gas, high-purity water Purity test records; 6. Equipment test run records: 7. System no-load joint test run and commissioning records; 8. Division quality comprehensive inspection records, including air filter leakage inspection. 9. The installation of various pipelines, purification air-conditioning equipment, automatic fire extinguishing devices, etc. should be correct, tight, and secure, and their deviations should comply with relevant regulations; 10. Various adjustment devices, valves, and accessories should be tight, flexible adjustment, and easy to operate. 11 , Purify the air-conditioning equipment, air duct system and return to Fengkou without dust: 12. The inner wall, inner surface of the top grille, floor, and various pipes of the dust-free workshop should be smooth, flat, dust-free, and uniform in color selection. There is no electrostatic phenomenon on the ground; 13. The sealing of various pipelines, return air outlets, switchboard cabinets, etc. passing through the dust-free pharmaceutical cleanroom is reliable and tight. 14. Air cleanliness level determination (for biological cleanliness, planktonic bacteria and sedimentation bacteria should also be measured. ); The above are the acceptance criteria for the clean room project, I hope it will be helpful to everyone!

SUZHOU PHARMA MACHINERY CO.,LTD. promises that we will manufature our products in accordance with the strictest quality standards.

Get cost effective and professional extraction machine advice for your solution at PHARMA MACHINERY. SUZHOU PHARMA MACHINERY CO.,LTD. expert is your first choice!

SUZHOU PHARMA MACHINERY CO.,LTD. believes that the average profitability will be sufficient.

The proprietor has many years experience in providing promotion services and is a sought after expert in CUSTOM SOLUTION SERVICES.

GET IN TOUCH WITH Us
recommended articles
Project
no data
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2025 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
email
whatsapp
contact customer service
Contact us
email
whatsapp
cancel
Customer service
detect