loading

Focuses On Professional Cleanroom Project And Pharmaceutical Cleanroom Equipment.

Disassembly and installation of main parts of PHARMA small tablet press

Disassembly and installation of main parts of PHARMA small tablet press

1Disassembly of the middle mold table of PHARMA small tablet press: pull out the powder baffle plate - remove the hopper - unscrew the set screw of the feeder - unscrew the fixing stud and spring of the feeder - remove the feeder - unscrew the middle mold table to fix Screws and spring washers, you can take off the mold table. Please refer to the above reverse order for installation. When screwing on the fastening screw of the feeder, it must be aligned so as not to damage the wire hole of the feeder.

2 To disassemble the upper punch rod of the small tablet press, first loosen the locking nut of the connecting rod, turn the upper punch rod to separate from the connecting rod, turn the hand wheel to raise the eccentric wheel housing to the highest position, and turn the eccentric connecting rod to swing the connecting rod. To the top front, the bian can pull out the upper punch rod from above the hole in the formwork. Refer to the above reverse order for installation.

3. To disassemble the lower punch of the small tablet press, the lower punch fixing screw must first be unscrewed. The butterfly screw and the gear platen rotate the adjustment gear to lower the lower punch and take it out from the bottom hole of the machine body. Please refer to the above reverse order for installation.

4 To disassemble the connecting rod of the PHARMA small tablet press, first remove the upper punch rod, then remove the wire retaining ring on the connecting rod pin, and take out the connecting rod pin to remove the connecting rod. Installation and cleaning are carried out in reverse order of the above.

5 Disassembly of the large pulley, pinion and bridge shaft of the small tablet press machine: push down on the V-belt, unscrew the right-end mother of the bridge shaft and the washer (inside the fuselage), and hold the large pulley together with the pinion by hand Pull out together with the bridge shaft, and then use the bridge shaft to be pulled out from the wheel hole. (The big belt pulley, the pinion and the axle sleeve are all pressed into one body, and generally do not need to be disassembled). Please refer to the above reverse order for installation.

6 The disassembly of the main shaft of the PHARMA small tablet press must first be disassembled by two people. First remove the large pulley, then unscrew the nut and remove the lever

Shaft and filling roller. (Remove the hand wheel and filling cam if necessary) Remove the protective cover, unscrew the screws and washers, and tap the non-working surface inside the large gear with a wooden hammer (not heavy). Remove it (be careful not to lose the lifting roller), and then tap the shaft end with a wooden hammer and copper rod (be careful not to damage the screw hole of the shaft end), hold the other end of the shaft and hold the eccentric wheel housing at the same time , slowly remove the spindle.

GET IN TOUCH WITH Us
recommended articles
Project
no data
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2025 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
email
whatsapp
contact customer service
Contact us
email
whatsapp
cancel
Customer service
detect