Design and Installation of General Electric Laboratory
General electrical laboratories should be centrally arranged according to standard units, special electrical laboratories should be arranged according to function, structure and space requirements, special electrical laboratories with similar clear height requirements should be arranged on the same floor; The electrical laboratory should be arranged in...
Text label: General Electric Laboratory, laboratory design and installation
Design and Installation of General Electric Laboratory
General electrical laboratories should be centrally arranged according to standard units, special electrical laboratories should be arranged according to function, structure and space requirements, special electrical laboratories with similar clear height requirements should be arranged on the same floor; Electrical laboratories should be arranged on the ground floor or basement, such as large anechoic chambers, large current and large-capacity laboratories should be set up on the ground floor or designed as independent buildings; wire and cable partial discharge laboratories and large vibration laboratories should be designed as independent buildings Or set up on the ground floor of the building; the laboratory area should meet the needs of testing work, provide enough operating space for working equipment, provide enough storage space for necessary auxiliary equipment and reagents, and provide enough testing personnel and management personnel. Workspace. Large-capacity on-off laboratories should select a large substation that can provide power according to the power capacity parameters. If an open field is used for electromagnetic compatibility testing, the corresponding surrounding electromagnetic environment level should be selected according to the level. The site is lower than the corresponding level limit. Generally It should be far away from the electromagnetic interference area; the laboratory of photovoltaic product laboratory to calibrate the secondary battery should choose the area with air quality between AM1 and AM2, and less absorption and scattering of solar radiation.
The electrical laboratory building with heating and air conditioning should reduce the area of u200bu200bthe exterior windows under the premise of meeting the lighting requirements. The exterior windows of the laboratory with air conditioning should have good airtightness and heat insulation, and should be No less than 1/3 of the window area can be opened; the outer windows of the ground floor, semi-basement and basement should take anti-insect measures, and all holes passing through the outer wall should be sealed tightly. All test areas of the electrical laboratory should ensure that there are passages that facilitate the transportation of equipment and samples. If there is a height difference between the two steps of the aisle ground, ramps should be set up in all parts, and the slope should not be greater than 1:8. For laboratories with large sample quality, lifting facilities should be configured as required, and at least one lifting platform should be set up in the electrical laboratory building and connected to the aisle. The multi-storey building of the electrical laboratory should be equipped with an elevator. If necessary, an appropriate special freight elevator should be selected according to the dimensions and quality of the equipment and samples. Generally, the tonnage of the freight elevator should not be less than 1.5t, the width of the door opening should not be less than 1.5m, the height should not be less than 2.1m, and the depth should not be less than 2.1m. It should not be less than 2.1m. Zhongjing Global Purification can provide consulting, planning, design, construction, installation, transformation and other supporting services for laboratories and electrical laboratories.
Facility rooms that generate vibration, such as gas supply station, generator room, and mechanical vibration laboratory, should not be adjacent to other laboratories, and should be located on the ground floor or basement, and vibration isolation measures should be taken for the facility foundation. There should be isolation measures for equipment that generates low-frequency magnetic fields such as partial discharge laboratories, large transformers, and high-power battery charge-discharge testing machines. If the testing items and testing equipment used are sensitive to background electromagnetic radiation, appropriate electromagnetic shielding, absorption, and grounding should be installed. , isolation or filtering and monitoring and maintenance. For the general electrical laboratory and indoor clear height, when the ceiling type air conditioner is not installed, it should not be lower than 3.5m, and when the ceiling type air conditioner is installed, it should not be less than 3m; the electrical laboratory should consider setting at least one floor, and the clear height should not be lower than 3.5m. Less than 4.5m, and should be arranged on the first floor of the ground, the clear height of the aisle should not be less than 2.2m, the indoor clear height of the special electrical laboratory should be determined according to the requirements of the size, installation and maintenance of the experimental equipment, and the clear height of the floor should be considered. For the layout of high equipment, super high equipment should be planned on the same floor, and there is room for maintenance in addition to accommodating equipment. The floor of the laboratory clean room modular, aisle and the surface of the stairs should be wear-resistant and pressure-resistant, waterproof and anti-skid, free from dust and dust. No dust; the laboratory floor using strong acid and alkali should have alkali resistance and corrosion resistance, and the laboratory floor with water supply requirements should be equipped with floor drains, between the wall and the wall, between the wall and the ground, and the wall. A semi-rounded corner with a radius of not less than 0.05m should be made between the surface and the ceiling, and the protruding building components and exposed pipes should be reduced indoors.
SUZHOU PHARMA MACHINERY CO.,LTD. have now make a decision to enlarge our company in other countries.
Knowing these basics of is every essential. But if you don't know how to choose the proper for your specific need, let SUZHOU PHARMA MACHINERY CO.,LTD. experts be your guide. Enquire us at PHARMA MACHINERY.
Although there are various available in the market (such as extraction machine, extraction machine, and extraction machine), recent study results have made this extraction machine CUSTOM SOLUTION SERVICES a preferred CUSTOM SOLUTION SERVICES choice of the people.
Many of the CUSTOM SOLUTION SERVICES listed here can be purchased for less money, but in general we recommend paying a slightly higher price for significantly improved performance. These are our top choices and their recommended configurations.