loading

Focuses On Professional Cleanroom Project And Pharmaceutical Cleanroom Equipment.

Design and construction scheme of cosmetic GMP purification workshop

One of the important sources of pollution in the purification pharmaceutical cleanroom of cosmetics factories is the air environment. Therefore, the purification level of the workshop air should be controlled according to the requirements of the production process and product quality. In the cosmetics production environment, the air in the cosmetics filling workshop must be designed in accordance with GMP requirements. Design basis 1. 'Provisions on the Depth of Architectural Engineering Design Documents' (2008 Edition) 2. 'General Principles of Civil Building Design' GB50352-20053. 'Code for Fire Protection Design of High-rise Civil Buildings' GB50045-95 (2005 Edition) 4. 'National Civil Buildings' Technical Measures for Engineering Design - Architecture (2003 Edition) 5. 'Code for Design of Water Supply and Drainage in Buildings' GB50015-2003 (2009 Edition) 6. 'Code for Fire Protection in Architectural Design' GB50016-20067. 'Code for Design of Scientific Experiment Buildings' JGJ91-938 .'Code for Design of pharmaceutical cleanroom' GB50073-20139. 'Code for Construction and Acceptance of Architectural Decoration Engineering' JGJ73-9110. 'Standard for Quality Inspection and Evaluation of Construction Engineering' GBJ301-8811. 'Code for Construction and Acceptance of Clean Room' GB50591-201012. Party A Description of design task book and other normative construction plans 1. Functional division is conducive to the work of workshop personnel. The existing workshop is divided into 3 large functional areas. Located on the left and right lower sides of the corridor. The left workshop is: washing room, water treatment room, batching room, unpacking room, mixing room, filling room, bottle cleaning and disinfection room; the right workshop is: washing room, batching room, unpacking room, mixing room, internal Packing room and finished product warehouse; the lower workshop is: outer packing room and finished product warehouse. The function of each room is displayed on the floor plan of each floor. 2. People and logistics personnel enter the clean room through the outside corridor, change shoes, change clothes, and enter the 100,000-level clean room after blowing in the air shower. Protective structure: The workshop is divided into upper and lower layers, the lower layer is the workshop, and the ceiling height is 3.0m. The upper layer is the installation layer for pipes, lines and small pharma machinery. This area has high requirements on the airtightness, thermal insulation and surface finish of the room. The enclosure materials are: a. The wall adopts high-grade steel keel and double-sided sandwich color steel plate (total thickness 50mm), and the inner surface of the masonry exterior wall is protected by high-grade steel keel and double-sided sandwich color steel plate. The height of the wall is the same as the upper surface of the ceiling, and the port is sealed flat. The rooms on the upper floor are interconnected for easy installation and construction. A large-area observation window is installed on the wall. Cosmetic workshop design b. The ceiling is made of high-quality steel keel and double-sided sandwich color steel plate. Under the ceiling is the pharma machinery, and above the ceiling is the installation layer of pipes and small pharma machinery. The suspenders are all 10mm diameter suspenders, and any suspenders with a length of more than 1.5m must be provided with reverse support. c. The ground adopts epoxy resin ground. d. The intersection angle between the wall and the ground adopts the same material as the ground to make a 5cm wide arc angle transition, and the intersection angle between the wall and the ceiling adopts the same homogenous arc angle transition as the wall. e. The door is a sandwich color steel plate door with observation window; the observation window on the wall is a single-layer tempered glass airtight type.

are present in just about every facet of modern life.

SUZHOU PHARMA MACHINERY CO.,LTD. endeavors to be valued as an industry leader in client satisfaction, sales growth, product performance, financial strength and profitability.

Long gone are those days when extraction machine were used to extraction machine. Now new like extraction machine CUSTOM SOLUTION SERVICES have come up.

GET IN TOUCH WITH Us
recommended articles
Project
no data
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2025 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
email
whatsapp
contact customer service
Contact us
email
whatsapp
cancel
Customer service
detect