Daily operation management of clean workshop
All personnel in the clean workshop must follow the prescribed purification routes and procedures when entering the clean area. They must not change privately and must put on special shoes before entering; the outer clothing and clean work clothes are stored in separate cabinets, and personnel entering the room must not enter without taking off their outer clothing. Clean room changing room, entering the clean area...
Text label: clean workshop design, clean workshop decoration, clean workshop management
Daily operation management of clean workshop
All personnel in the clean workshop must follow the prescribed purification routes and procedures when entering the clean area. They must not change privately and must put on special shoes before entering; the outer clothing and clean work clothes are stored in separate cabinets, and personnel entering the room must not enter without taking off their outer clothing. In the changing room of the clean room, before entering the clean area, the slippers should be wiped on the cleaner or on the wet mat; at the entrance of the clean area, if there is an air shower room, entering personnel must pass through the blow shower room, and after entering the clean area, they must Wash your hands at any time as needed, and change your work clothes after washing your hands; dry your washed hands with a clean dryer, or dry them with a paper towel that generates less dust; wash your hands after changing your work clothes, and do not operate the cleaned hands with your bare hands Parts, products and packaging materials; wear clean gloves or finger cots to enter pharma clean room facility operations.
The dirt accumulated in the cleaner must be removed regularly, especially in rainy or humid weather; the adhesive pad must be replaced regularly, or the thin layer of contamination on the surface must be removed regularly, and the wet pad must be cleaned daily; The faucet is equipped with an induction type, not twisted by hand; materials with less dust generation, such as aluminum with appropriate surface treatment, or workbenches and chairs of good quality, preferably made of stainless steel; workbenches and lattice structures in clean workshops should be As simple as possible, the edges and corners of the furniture should be rounded, and the legs and feet should be covered with rubber or plastic covers; the height of the equipment cabinet should be easy to clean the top surface by hand, the drawers should be equipped with balls with less wear, and the truck should be made of stainless steel, Hard plastic or steel or aluminum alloy with appropriate surface treatment; inspect, replace and record the filters at all levels according to the specified content and cycle. Zhongjing Global Purification can provide consulting, planning, design, construction, installation, transformation and other supporting services for clean workshops and clean projects.
The material of the clean clothes should be materials that do not generate static electricity or undergo anti-static treatment. The clean clothes should be separated from the clothes and pants, and the top must be placed in the pants; there should be a hat or shawl cap and special canvas shoes for the clean room. , For high-level clean rooms, it is advisable to add long shoe covers and gloves. When using shawl caps in high-level clean rooms, the hem should be placed inside the jacket. Only the back half of the hat is not allowed. The ends of the hair should be fully covered; clean clothes are best to use dust-free water, and clean clothes must be washed, dried, and packaged in a clean environment to avoid re-attachment of dust particles. The cleaning of the clean pharmaceutical cleanroom should be done every day before the end of the process operation, and the cleaning should be carried out during the operation of the purification air-conditioning system. When the centralized vacuum cleaning system is used to complete the cleaning work, the exhaust volume of the vacuum system should be limited to avoid cleaning The positive pressure of the workshop is reduced too much and even becomes negative pressure; for the biological clean room, the dust bag and filter in the vacuum cleaner should be sterilized with gas before being taken out, and then put into a polyethylene bag and sealed; the purification air-conditioning system is activated When the system is not running, it is forbidden to open the return fan first; when the system is closed, stop the supply fan first; when the system is not running, the local exhaust system should not be opened separately; the automatic closing door and positive pressure control device should be checked frequently to avoid malfunction.
To be the best worldwide provider of higher-value CUSTOM SOLUTION SERVICES and the center for quality employment opportunities.
The best way to confront your extraction machine problem is to search for a high quality offered by SUZHOU PHARMA MACHINERY CO.,LTD. at PHARMA MACHINERY. Take a look!
The extraction machine CUSTOM SOLUTION SERVICES is an all-servo system capable of storing hundreds of extraction machine process parameters to provide custom extraction machine profiles for each extraction machine type and extraction machine configuration.