Common problems of unqualified clean engineering acceptance

Common problems of unqualified clean engineering acceptance

When the cleaning project is over, the factory will entrust a third-party testing company to carry out acceptance testing of the decoration project, and it can only be used after passing the test. According to previous acceptance experience, the number of unqualified acceptance tests is relatively small. The reason why the acceptance failed is because the cleanliness and fresh air ventilation in the clean room cannot meet the standard requirements. Let's learn about the two major problems in the acceptance.

There are two main reasons why the cleanliness does not meet the standard during the acceptance inspection: one is that the quality of air-conditioning equipment such as filters is not up to standard; the other is that the quality of clean room decoration and construction is not up to standard. If the quality of air conditioning equipment such as filters is not up to standard, just replace it. If the quality of the decoration construction is not up to standard, the clean engineering decoration company needs to re-check the construction project, troubleshoot and solve the problem, which will take a lot of time and cost.

There will also be a problem of insufficient air volume and speed during acceptance. Insufficient air supply will directly lead to the failure of the number of air changes in the clean clean room modular or the cross-sectional wind speed of the laminar flow clean clean room modular, which is an important parameter of the clean room. In the final analysis, the clean clean room modular should control the dust concentration in the indoor air within the corresponding range to achieve the corresponding cleanliness.

The main reasons for insufficient air volume and wind speed are as follows. First, the air-conditioning air supply system is not tightly sealed, resulting in gas leakage during the transmission process. The second is that the number of air inlets and outlets is insufficient or the air change frequency of the air outlets is too low. When determining the decoration plan of the clean project, the designer needs to determine the appropriate air volume and speed according to the production situation of the factory workshop. When the design is unreasonable, there will be insufficient air inlet and outlet. Case.

CUSTOM SOLUTION SERVICES is a good way to humanize PHARMA and engage your target customers.

PHARMA MACHINERY has a whole range of different items to help you make an informed choice every time you make a purchase. Check it!

These extraction machine CUSTOM SOLUTION SERVICES are not only useful but also more cost effective than those traditional ones.

There are so many factors that businesses have to weigh when producing CUSTOM SOLUTION SERVICES, and we are not going to pretend to grasp all of them.

SUZHOU PHARMA MACHINERY CO.,LTD. believes that the average profitability will be sufficient.

GET IN TOUCH WITH Us
recommended articles
Project
no data
Contact Us
Telephone: +86-18241958031/
+86-18913598640
Fax: 86-512-65488640
Whatsapp/Wechat: 008618241958031

Notice:
We hereby declare that our company's only legal contact is through the the above email, Any other similar suffix is a scammer email. 
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district, Suzhou city, Jiangsu province, China
no data
Copyright © 2025 Suzhou Pharma Machinery Co., Ltd. | Privacy Policy  Sitemap
Contact us
email
whatsapp
contact customer service
Contact us
email
whatsapp
cancel
Customer service
detect