Even if the clean workshop is well built and safe, accidents may happen sometimes. When accidents happen, we must deal with them calmly to minimize the danger and financial losses. Here are some common emergency response methods.
1. When designing and building the clean room, prepare escape routes in advance so that worker can evacuate to safe area quickly. Arrange fire drills and training regularly so that worker have respond ability in advance.
2. Install fire alarm equipment and conduct regular inspections and maintenance to ensure that the alarm can be called in time.
3. Equip fire extinguishing equipment according to fire protection requirements. If the fire is small, workers can use fire extinguishers for initial firefighting to avoid wasting time. However, the safety of the fire must be guaranteed first. If the fire expands or cannot be controlled, the firefighting should be stopped immediately and evacuated.
4. Set up an emergency power cut-off device. Fire smoke can spread to other areas through the air conditioning system. Therefore, the power supply should be cut off at the first time to prevent the fire from spreading.
1.Arrange pre-training for workers to let them know all the chemicals used in the dust free room workshop, and understand their properties and potential hazards.
2.Train workers how to properly use protective equipment and handle leaks. Prepare leakage treatment materials corresponding to all chemicals in the dust free workshop, such as adsorbents, neutralizers, they can be handled immediately when a leak occurs to prevent the spread of the leak.
3. Evacuate all personnel in and around the leak area, and avoid inhaling harmful gases or contacting toxic substances during the evacuation process.
1.Maintain and inspect the equipment regularly to reduce the occurrence of failures.
2. When the equipment have dangerous failure, shut down the machine immediately. In serious cases, cut off the power supply of the entire dust free foom workshop to prevent the spread of danger.
3. Train employees to learn to repair equipment failures.
1. The natural conditions in different countries and regions are different. Corresponding emergency plans should be formulated for different disasters such as floods, fires, earthquakes, volcanoes, etc. according to the local conditions.
2. Prepare necessary disaster relief supplies and equipment, such as emergency lighting, sandbag fire extinguishers, gas masks, etc.
The safety of clean workshops is the basis for maintaining development, so we must strengthen work in all aspects to avoid and reduce the occurrence of accidents. Suzhou Pharma focuses on the design, production and installation of ISO cleanrooms and biological laboratories. It has mature experience in the field of cleanroom turnkey project and is your trusted partner.
Suzhou Pharma Machinery Co.,Ltd.
2024/11/1