Clean workshop supporting air treatment room installation
All types of materials, pads, and hardware used in the installation process of the air treatment room in the clean workshop should have a factory certificate or related certificates; the documents should also be visually inspected, and there should be no defects such as serious damage and rust; flange connections The litter used should be selected according to the design requirements...
Text label: clean workshop design and installation, clean workshop decoration, air treatment room installation
Clean workshop supporting air treatment room installation
All types of materials, pads, and hardware used in the installation process of the air treatment room in the clean workshop should have a factory certificate or related certificates; the documents should also be visually inspected, and there should be no defects such as serious damage and rust; flange connections The litter used should be selected according to the design requirements and meet the requirements of fire resistance, moisture resistance and corrosion resistance; the materials used for installation should not affect the installation quality and use effect due to quality problems; check the site before installation, and there should be enough transportation space ; Before installation, the installation site should be cleaned up, and there should be no obstruction by other pipes or equipment; the equipment model, basic size and position of the equipment should meet the design requirements; when the equipment is transported horizontally, a small trailer should be used as far as possible; when the equipment is lifted, it should be When there is no lifting point for hoisting, the lifting point should be set on the main beam of the base of the metal air-conditioning box; when installing, check whether each section of the metal air-conditioning box is consistent with the design drawings, and the equipment and components installed in each section. Whether it is complete or not, the accessories must be complete; prepare the bolts, gaskets and other materials and necessary tools for installation; the installation site must be flat, and the processed channel steel base of the air conditioner box is in place and aligned and leveled; when there are several air conditioners on site When installing the box, be careful not to pull the unit wrong, distinguish the left and right types, and the arrangement order of the segments must be consistent with the drawings; The gaps of the air conditioners should be tightly blocked with heat-resistant materials; the connection between the various functional sections of the installed combined air-conditioning unit should be tight and straight as a whole, the inspection door should be opened flexibly, and the waterway should be smooth.
The installation place of the air-conditioning unit must be flat, generally 100-150mm above the ground; if the air unit needs to install the shock absorber, it should be installed, leveled and aligned in strict accordance with the type, quantity and position of the shock absorber required by the design; The cooling water system, steam, hot water pipes and electrical power and control lines of the air-conditioning unit shall be installed by plumbers and electricians; medium-efficiency or high-efficiency filters must be completed in the clean pharmaceutical cleanroom, cleaned and tested for 12 hours before unpacking and inspection, and qualified Immediately after installation; a sealing gasket should be added between the filter and the frame, the thickness should be 6-8mm, and the compression rate of the gasket should be greater than 50% after installation; the tank should be sealed, the tank frame should be installed horizontally, and there is a lot of sealing liquid in the tank At two-thirds of the groove depth; the arrow on the outer frame should be consistent with the direction of the airflow during installation. The corrugated plate must be perpendicular to the ground when the filter combined with the corrugated plate is installed vertically, and must not be reversed; when multiple filters are installed in combination , It should be reasonably configured according to the initial resistance of each filter, and the difference between the rated resistance of each filter and the flat resistance of each filter should be less than 5%. Zhongjing Global Purification can provide consulting, planning, design, construction, installation, transformation and other supporting services for clean workshops and purification workshops.
The installation direction of the high-efficiency filter must be correct. When the filter combined with corrugated plate is installed vertically, the corrugated plate must be perpendicular to the ground. The connection between the filter and the frame is strictly prohibited from leakage, deformation, damage and leakage of glue, etc. ;The air-conditioning box and medium-efficiency filter room of the clean system must be installed to ensure that the inner wall is clean, free of floating dust, oil, rust and debris; There are no obvious gaps, and the primary and secondary return air control valves and fresh air control valves can be adjusted flexibly; the closed inspection door should meet the requirements of the door and door frame being flat, firm, leak-free and flexible opening and closing, and the drainage pipe of condensed water is unobstructed; surface heating The installation of the exchanger should be flat, firm and stable, and the gaps between the heat exchangers and between the heat exchanger and the surrounding maintenance should be sealed; the installation of the window air conditioner should be firmly fixed, with sunshade and rainproof measures, and not blocking the condenser. The exhaust and condensate pans should be sloped, closed with the surrounding gaps, the front is horizontal and vertical and the surrounding gaps are sealed, which is harmonious and beautiful with the indoor layout; after the air treatment room is installed in place, external protection measures should be taken before the system is connected It should not be damaged to prevent sundries from falling into the unit.
In the past few decades, extraction machine production has increased because of the use of CUSTOM SOLUTION SERVICES.
The best for extraction machine is one that works best for your needs and what you can support in your home. Among SUZHOU PHARMA MACHINERY CO.,LTD.'s diversified list of products at different price ranges, you will surely find your one with high quality. make your choice at PHARMA MACHINERY!
SUZHOU PHARMA MACHINERY CO.,LTD. can reassign work or shuffle around assigned tasks if one team member is overwhelmed while others are not, more effectively managing resources on the fly. With detailed overviews and reports, manufacturers also can more easily stay abreast of new developments.
Technology upgrades can pay for themselves quickly by improving CUSTOM SOLUTION SERVICES and enabling employees to accomplish more in less time. It may be time to focus on extraction machine to ensure they run smoothly and efficiently.