Electricity is an essential part of our life and work. Therefore, the circuit installation and construction part is very important in the electrical and mechanical installation of Suzhou Fama. If it is not handled properly, there will be potential safety hazards. Let's take a look at how to do a good job in circuit installation and construction in Suzhou Fama electromechanical installation. 1. In the circuit construction and wiring, the principles of strong upper and weak lower, horizontal and vertical, avoiding crossing, practical and beautiful; 2. The depth of the circuit installation slot is greater than or equal to 0.5CM in diameter of the PVC pipe, and the depth is the same; 3. Suzhou FACODE electromechanical installation In the circuit, the wire cross-sectional area cutting standard: lighting and ordinary sockets are 2.5MM, air-conditioning sockets are 4.0MM, and the entrance line is 6.0MM; 4. The circuit installation and construction are all covered with PVC pipes except for the sheathed lines, and the length of the line pipe exceeds 15M Or when the 4M single pipe has 3 right-angle bends, a junction box is added in the middle; multiple rows of PVC pipes are bundled with metal wires or cable ties; pipe joints are glued with pipe hoop glue; Fix it with a junction box; the ground pipe passing through the aisle is fixed with cement before laying bricks; 5. The same circuit wires installed by Suzhou Fama Electromechanical Machinery should be inserted into the same pipe, but the total number of pipes in the pipe is less than or equal to 8, and the power line and the communication line cannot be piped together. The horizontal distance between the power cord (socket) and the TV line (socket) is ≥50CM, and the horizontal distance between the electric wire (socket) and the heating, hot water and gas pipelines is ≥30CM; , The margin of the wire head is ≥10CM, and the joint is firmly lapped; 7. When the circuit installation construction faces the installation of the power socket, the left neutral wire (N), the right phase wire (L), and the upper soft two-color protective ground wire (PE); 8. Do a good job in the electrical and mechanical installation of Suzhou FA Code. When connecting switches and screw lamps, the phase wire is connected to the switch, the central reed tongue of the lamp, and the neutral wire is connected to the reed tongue of the thread; 9. The height of the bottom edge of the power socket for circuit installation is 30CM from the ground. , the height of the switch is 130CM, the height of the wall-mounted air conditioner socket is 190CM, the power supply, telephone, and computer sockets in the same clean room modular are on a horizontal level, and the height difference is ≤1CM; : 10A for lighting, 16A for sockets, 20A for air conditioning, and 40-60A for households; 11. After the construction of the electrical and mechanical installation circuit of Suzhou Fama, the construction waste should be removed in time.
SUZHOU PHARMA MACHINERY CO.,LTD., as well, confirms that consumers who want ethically produced goods do the work of looking for them.
Try out extraction machine CUSTOM SOLUTION SERVICES to beautify your extraction machine. Visit PHARMA MACHINERY to get your dreaming at a favorable price.
The more people who do a certain thing, the more likely others are to do it as well. When PHARMA can demonstrate their popularity or satisfaction across a wide customer base, other consumers are more likely to buy in as well.
SUZHOU PHARMA MACHINERY CO.,LTD. employs a numbers of citizens, helping them and their families achieve a higher standard of living.