Better Touch Better Business
Conta t Sales at PHARMA.
Air Shower Installation Video-1
first step,
Find the air shower base,
set up,
The second step,
Find the right side of the air shower
move the right side,
put in the corresponding position
open the right side,
Lower return air vent cover
move the right side,
Use 6 angle screws with the bottom,
linked together.
Hexagon screw connection,
We have drilled and positioned,
You can directly correspond to the hole link.
After the link on the right is completed,
Also find the left side,
Note (with combination lock on the left, control panel)
After you find it, you can also link it at the bottom.
Suzhou Pharma Machinery Co.,Ltd.
2022/06/17
Kevin
Quick Links
Product Classification
Contact Us
Telephone: 86-18241958031/86-18913598640
Fax: 86-512-65488640
Email: pharma@sz-pharma.com
Whatsapp/Wechat: 008618241958031
Facebook: 008618241958031
Address: NO.188 xiangwei road, near junction of xiangwei road and chengyang road (the second floor of south building inside of haiji feiyue) Xiangcheng district,Suzhou city, Jiangsu province, China